Day 1

Today Saturday 1st December 2018 is the start of the future of Koi Water Barn at our new site at Coolings Garden Centre

Access gained today to our new home and work will be starting today on the main display room which we aim to have up and running before Christmas. Before work moves onto the small Koi room, main shop, and of course the outside area which will also feature a very large and impressive display pond.


Paid banner advert - put your ad here for just £50 per month

So the picture below will soon become a distant one as this room takes shape as one of the best Koi showrooms in the Koi Industry…. showcasing not just the best Koi but also the most advance filtration equipment on the market all in a very modern and stylish environment.

Please feel to ask any questions and enjoy the journey, we all are at the Barn!!!

The bare shell which will transform to be the new Koi Water Barn

The bare shell which will transform to be the new Koi Water Barn

 

Day 3

All go once again…

Meeting first thing to confirm the piecework layout which was marked out Sunday – massive thank you to Darren Metalli of Koizen and Bartek for doing this on a Sunday for us….


Paid banner advert - put your ad here for just £50 per month

Then finishing off drilling the floor for rebar, which was then fitted and bonded to floor.

While all this was happening I was busy ordering all materials including two very large panels of glass for the viewing windows… watch this space..

Tomorrow should see very good progress made with pipework arriving, and the water supply being installed for the top up system by Andrew Logan for all of the ponds in the main display room!

Marking the new floor layout

Marking the new floor layout

Marking the new floor layout

Marking the new floor layout

Vertical rebar drilled into the concrete floor

Vertical rebar drilled into the concrete floor

 

Day 4

All go today lots of pipework deliveries today, to get the drains in place ready for the hollow blocks to be laid tomorrow.


Paid banner advert - put your ad here for just £50 per month

Mains water supply connected up and run around building to location for ponds for auto top up systems.

The next few days are critical with deliveries turning up on time, to allow the blocks to start being laid on Friday after the pour of the base on Thursday!!

Then things should really go into overdrive to get the ponds built before the glass arrives next week

Temp sign added as well today to let people know where we will be located.

 

Bottom drain pipe runs

Bottom drain pipe runs

Water pipes installed for auto top up system

Water pipes installed for auto top up system

Water pipes installed for auto top up system

Water pipes installed for auto top up system

Temporary sign inside Coolings Garden Centre.

Temporary sign inside Coolings Garden Centre.

Day 5


Paid banner advert - put your ad here for just £50 per month

The weather was horrible all day but was this a problem? No, not for us all inside!!! Just a bit of fun with the three large deliveries that were turning up first thing of blocks, sand, dust, and celotex!! Then more 6mtr lengths of pressure pipe, just needed to get them inside as quickly as possible to keep them dry!!

A real push from everybody today, all pipework laid out at and the first course of hollows laid, ready for the big 9cu mtr pour tomorrow midday.

Also all go at the existing Barn site getting ready for the big move over which starts next week. With the Goldfish ponds taken down and the courtyard area nearly empty now. Skip booked for tomorrow so things should really speed up!

A productive day had by all, and all set for the next few days which will see some ponds taking real shape at the new Barn at Coolings, and quickly thanks to the speed of Darren Metalli, and his team.

Then on the small Koi room, some real progress made with the design of these ponds which once again will be something amazing – so another thing to look forward to !!!

Day 6 tomorrow, how do you think we are doing considering we have not even been going a week!!


Paid banner advert - put your ad here for just £50 per month

Wall construction underway

Wall construction underway

Wall construction underway

Wall construction underway

 

Day 6

…. and what a day!!

Today, the 6th day of the build, was a big day with the bases being poured for the ponds!!!

Darren Metalli and Bart worked there nuts off to be frank once the concrete turned up to get it all done!!!

Some 10 cubic mtr, all pumped to form the base of all of the ponds and the filter areas, and to fill the hollow blocks on the first row!!


Paid banner advert - put your ad here for just £50 per month

All done in two hours, super job!!

Well done Fleetmix for your fantastic service!

I was on H&S duty in the car park while this was all happening!! And before this in meetings discussing media solutions and telecoms. While Andrew was on site first thing to install another tapped water feed, and then at existing KWB busy sorting for main move next week!

This leaves us ready for tomorrow to lay the rest of the hollow blocks, and rake in the corners were the most strength will be needed!!

Concrete arrives

Concrete arrives

Concrete pump

Concrete pump

Pond bases being poured and levelled

Pond bases being poured and levelled

Pond bases being poured and levelled

Pond bases being poured and levelled

Pond bases being poured and levelled

Pond bases being poured and levelled

Pond bases being poured and levelled

Pond bases being poured and levelled

Pond bases being poured and levelled

Pond bases being poured and levelled

6th December 2018, a landmark day

6th December 2018, a landmark day

Day 7

Not great weather for building ponds if out side, the rain was lashing down!!


Paid banner advert - put your ad here for just £50 per month

Lucky for us all in doors, and the base had gone of a treat over night ready for the start of the walls!

Well what a great day considering the weather, but that is the benefit of being inside.

More hollow blocks laid, and more steel added in the vital points for windows.

Blocks moved ready for the hard push tommorrow to get some walls up and skimmers installed.

Great work from Darren, Bart and Jim as always!

 


Paid banner advert - put your ad here for just £50 per month

You can continue to follow the build of the new Koi Water Barn build at Coolings Garden Centre on the Koi Water Barn Facebook page at – https://www.facebook.com/koi.waterbarn/


Paid banner advert - put your ad here for just £50 per month